Hino Install In Short Time

  • Category: Installation
  • Client: Hino Motors Manufacturing

Project Summary

When Hino Motors Manufacturing began to plan for a plant expansion at their West Virginia truck plant, LG Fox was brought in to help. The job had a very tight production window, so we meticulously pre-planned all phases of the job to ensure efficient execution. The planning stage included traveling to Japan where we reviewed and inspected the Anzen equipment we would be installing in West Virginia.

LG Fox designed, engineered, fabricated and installed all necessary structural support steel for the equipment, and provided PE stamps for all drawings. As a turnkey provider, LG Fox not only installed all of the equipment, but provided hook up for all electric, pneumatic and secondary wiring.

  • The installation included:
  • Brake testing equipment
  • Speed testing equipment
  • Side slip testing equipment

We worked 10 hour days, seven days a week for three weeks in 3 weeks, and completed the project on time and on budget.

Project Photos

Tap or click an image below to view the gallery.

Put Our Expertise To Work For You

LG Fox has the experience to complete your project safely, on time, and on budget. Contact Us Today.